Installation Commissioning and Completion Form
Site Name
*
Description of equipment installed
*
Is the equipment mounted and secure?
Yes
No
N/A
Are all connections tested and secure?
Yes
No
N/A
Is RS485 or network cabling connected?
Yes
No
N/A
Are all covers on equipment?
Yes
No
N/A
Is power available to the equipment?
Yes
No
N/A
Has the equipment been powered up?
Yes
No
N/A
Are all displays, images and LEDS working?
Yes
No
N/A
Are all key switches secured and working?
Yes
No
N/A
In local mode, are all readers working?
Yes
No
N/A
In online mode, has it been tested with laptop?
Yes
No
N/A
In online mode, has it been tested with customer's PC?
Yes
No
N/A
Is the work area clean?
Yes
No
N/A
Has the condition of the equipment been inspected?
Yes
No
N/A
Has the equipment been demonstrated?
Yes
No
N/A
Who was the equipment demonstrated to:
Keys left with (enter name below)
Other items left on site (please list below)
Has Fire Alarm been tested?
Yes
No
N/A
Have photographs been taken?
Yes
No
Additional Information
Customer Name
*
Customer Signature
*
Customer Email address
Engineer Name
*
Engineer Signature
*
Date
-
Day
-
Month
Year
Date Picker Icon
Tel: 01582 769991
Email: support@telepen.co.uk
Submit
Should be Empty: